Steel for Success: Episode #2

Valuable Analysis of Steel with a Long Lead Time

Posted: November 2022

Featured Guest: Ryan Carr, Technical Services Manager

 

Keeping production on track with in-depth analysis of a hard-to-get steel alloy.

A customer was using a unique alloy that was hard to get, with long lead times. While working with their material, we encountered an unusual surface characteristic and needed to determine if that condition would disrupt final part production. From a simple tape test (really), to microscopic analysis, we studied the surface problem “in depth.”

Listen to find out how our metallurgy team collected the right data to help our customer decide whether to use the steel. Or lose it.

Our Resource Library

Researching a problem? Good chance we already solved it.

Have Questions?

We have ears to listen. And experts who answer.